The manufacturing area has been operating since 2021. The manufacturing area meets modern requirements and allows to produce 340 cubic meters of sand and gravel per hour. Production of sand-gravel products is carried out by means of technological lines. In the manufacturing area, equipped with modern equipment, that made in Turkey, producing 90 and 250 cubic meters of finished product per hour, was installed. The manufacturing area was registered by the Ministry of Emergency Situations, Ministry of Ecology and Natural Resources. The manufacturing area operates on an order basis and plays a key role in meeting the demand for sand-gravel products needed for the implementation of rehabilitation works in Lachin district. It provides the demand for the use of local construction materials in the implementation of the reconstruction project of the city of Lachin. Works in our manufacturing area are performed by experienced and highly qualified specialists, and so far there has been no dissatisfaction between us and the clients.